| ENVIRONMENTAL STATUS OF PROJECTS: | 1/10/2008 | ||||||||||||||||||
| Status | Env. Project Manager | Agency | Proj. Mgr (Env. Eng.) | PRMS Completion Date | NEPA | Remarks | Checklist Memo Sent | Public Involvement | Permits | Agency Contact and Phone Number | |||||||||
| EIS/EA/CE | FWS - Section 7 Concurrence | 4(f) doc. | SHPO - 106 Concurrence | Corps of Engineers | State | TVA | |||||||||||||
| Nationwide | Individual | NPDES | State 401 | CZM | |||||||||||||||
| Done | SS | DDOT | Morris | 14th Street Bridge Project 3 | 06/13/04 | CE signed 2/13/04 CE sent to DC Division Office for sign 2/19/04 | Rec. concurrence by letter dated 5/1/02 | Letter sent to DC SHPO 1/21/04. Received concurrence 3/24/04. | Signing in DC for I-395 - NCPC approval rec. 3/10/04 | Contractor to get Coast Guard Permit/coordination | DC Sediment & Erosion Control Permit not required. Got concurrence from DC Watershed. | ||||||||
| Done | BAA | SER | Atkins | ABLI 11(1), 12(1) | 12/16/04 | FHWA sent CE to NPS for signature on 1/20/04. Signed by NPS on1/26/04 | FHWA sent letter to FWS 8/5/2003 - No adverse impact by FWS response dated 9/11/03 | Exempt | NPS completed 1/7/04. NPS to do supplemental Arch. Study to find Lincoln Home (N/A tp project; outside of construction limits) | Resurface entrance roads and parking areas | Not required. Checked quad for blue line streams on 6/14/2004 (DH). | FHWA to get. > 1 acre of disturbance (DH checked 6/14/2004). Area of disturbance = 2.3 acres. NOI sent to KY 8/5/04 (BB). Approval letter received 11/23/04. Permit KPDES no: KYR107677, received 9/22/06 | Not required. Checked quad for blue line stream on 6/14/2004 (DH). | ||||||
| Done | BAA | NER | Matzke | ACAD 300(1) | 05/09/05 | NPS sent 6/1/2004. Received 6/8/2004 Plans sent to park 5/26/2004. | NPS will send letter with CE. | NPS has completed. Will send with CE. | Rehab walls and bridges | N/A | N/A | N/A | N/A | ||||||
| Done | NER | Corrado | ACAD ITS | 05/01/01 | NPS Completed CE 3/15/01 | NPS received No Adverse Effect Determination from SHPO 3/15/01. | SAIC to complete all environmental compliance items and obtain all permits. | ||||||||||||
| Done | BAA | NER | Arnold | ALPO 10(1), 900(1) | 06/03/05 | FHWA CE completed 7/7/03 | letter sent to FWS 8/5/2003 - Section 7 complete by letter dated 9/4/03 | NPS completed | Rehab. Visitor Center access and PA | N/A | N/A | NPDES received 9/7/2004. Updates sent to Steve Putt for review 3/29/2005. Received letter 5/5/2005 stating no changes need to be made - permit stands for 3 years. | N/A | ||||||
| Active | LT | NER | Shifflet | ANTI 300(1), 900 (1) | 10/06/06 | FHWA to complete EA | FHWA completed | Archeological survey awarded. ARPA permit obtained. Pre-fieldwork mtg. November 7th. | M &O Roads and Walkways, Scoping by Summer of 2004 | 7/19/2005 | MDE and DNR Permits may be required. FHWA to do. | ||||||||
| Pending | FS | AR PFH 158(1) | 10/01/08 | FHWA to do EA | Phase 1 6.4 rd reconstruction from AR 25 to AR 84, Goat Branch Rd/ Shady Lake | ||||||||||||||
| Done | FS | Weber | AR PFH 65-3(4) | 06/01/01 | EA & FONSI Complete 04/23/98 | Complete - No T&E will be impacted by construction | Clearance complete. Some additional field work required as a permit condition. | FHWA received NWP #14 in August, 2000. | FHWA Received Permit 12/00 | FHWA received. | Received 12/00 | ||||||||
| Active | LT | FS | Wong | AR PFH 65-3(5) | 03/21/06 | EA/FONSI complete | Complete | FHWA to do | last phase of the reconstruction of FH 65 | 9/28/06 - Permit received for riprap placement, does not cover temporary access for construction vehicles. Am coordinating with USACE to remedy this situation. 10/11/06 - Permit in hand. | AR DEQ permit required for more than 10 acres disturbance. | FHWA to do | State 401 Cert and Short Term Activity Authorization applied for on 9/15/06 | ||||||
| Done | FS | Weber | AR PFH 65-3(6) | 12/15/99 | EA Comp. Feb. 1998 | 4/23/1998 | Clarifying design only status. | Received NWP | rec. 7/30/99 | Water Quality Testing to be done by AR Dept. of Hwys & Traffic | |||||||||
| Active | KR | FWS | Madlansacay | ARS 10(1) | TBD 2004 | Not yet Scoped. | |||||||||||||
| Pending | BAM | NER | Shifflet | ASIS 14(1) | 12/01/06 | NPS to do EA- Planning study underway | NPS to do. | Overlay North Beach Dr. and Reconfigure Fee Station Area | |||||||||||
| Active | NF | NER | Shifflet | ASIS 14(3) | 04/19/06 | CE completed on 11/16/05 | Completed on 09/02/04 | N/A | NPS completed on 8/13/2004 | Rehab. Park Entrance Road and Fee Station | Permit issued 9/9/06 | Received LOA from MD for work in nontidal wetlands 9/18/06 | |||||||
| Active | BAM | NCR | Patel | BAWA 1D18 | 11/13/05 | FHWA completed CE, NPS signed on 4/27/05 | Sent letter to FWS on 3/16/2004. Completed by letter dated 7/9/04. | NPS completed . Call to Charles Borders on June 8, 2004. He will call and check status. Email sent to CB on 12/22/04 | Rehab bridge decks over 1-495 - 2 bridges - Project is Design/Build, Consultant to do permits | ||||||||||
| Pending | SEG | NPS | Johnson | BAWA 1F18 | ??? | CE complete 8/21/06 | Letter sent 7/12/06; concurrence rec. 8/7/06 | Letter sent to NACE; XXX rec. 8/10/06 | Emergency project; Letter contract; Cond. Cert 8/22/06 | Plans given to Reid 7/12/06; Special storm emergency permit | ESC Plans approved 9/27/06 | ||||||||
| Active | NF | SER | Madlansacay | BISO 150(1), 913(1), 914(1) | 02/06/06 | Scoping completed 6/17/03 - Called park May 27, 2004. NPS completed CE 8/20/04. | Completed by NPS with CE | NPS completed from tree line to tree line. Completed with CE | Rehab Leatherwood Ford Road Reconstruction of .7 mile of Overlook Rd and mill and overlay 2 PA's | 10/6/2003 | NPDES Storm Water Construction Permit sent to TNDEC 12/16/05 w/ plans, $250 fee, maps. Baxter Wilson of Tennessee Department of Environment and Conservation says he is sending permit as of 3/20/2006. Permit received 3/20/2006. Expires 5/30/2010. | ||||||||
| Active | KR | FWS | Madlansacay | BKB 10(1) | 10/01/06 | CE by 12/13/04 | FWS to do. | FWS to do. | Entrance Rd foot trail | Permits by 1/12/05 | |||||||||
| Done | FWS | Weber | BLD 10(1), CHE 10(1) | 10/27/99 | Completed 9/8/99 | FWS to do. | NA | FWS to do. | To be in P&C for advertisement 9/2/99 | 9/1/1999 | NWP #3 and #14 received. Two year expiration. | Mailed 8/16/99 Rec. 9/28/99 | Environment Tasks Complete | ||||||
| Active | NF | SER | Shifflett | BLRI 1B6, C4 | 10/01/07 | NPS Completed CE dated 1/21/04 | NPS completed with CE | NPS completed 1/19/04 | Resurfacing of Section 1B | FHWA to do if req. | FHWA to do if req. | Leon Clifford | |||||||
| Pending | BAM | SER | Wong | BLRI 1D6 | 01/01/10 | NPS completed CE 10/3/03 | NPS completed 10/3/03 | Rehab Section 1D MP 15 to MP 27 - Project is delayed to FY 10 by NPS in FY05 | 9/26/2003 and 10/22/03 | FHWA to do if req. | FHWA to do if req. | FHWA to get VA DCR erosion and sediment control approval. | |||||||
| Active | NF | SER | Pakhchanian | BLRI 1M19 | 10/01/06 | NPS to do | NPS to do | Rehab. Glade Creek Bridge | No work in the stream - no permit required. | less than 1 acre - no permit req. | |||||||||
| Active | NF | SER | Shifflet | BLRI 1N18 | 05/03/06 | NPS completed CE 2/3/03 | Completed with CE | NPS completed 1/23/03 | 11/20/2003 | n/a | Required. Permit VAR103957 Issued July 1, 2004, expires June 30, 2009. |
n/a | |||||||
| Done | SER | Nishimoto | BLRI 1T15 | 09/27/99 | VDOT to do. | VDOT to do. | Lead paint possibly present Design only. | Completed 04/01/99 | Bill Witmer, NPS Steve Stone - DSC 303-969-2252 | ||||||||||
| Active | NF | SER | Madlansacay | BLRI 2A14 | 01/01/11 | NPS to do CE by 6/27/05 | NPS to do | NPS to do | Rehab Big Pine Creek Bridge | Sent on 10/22/03 | FHWA to do if req. | NC DENR - FHWA to get | |||||||
| Active | NF | SER | Shifflett | BLRI 2B11 | 10/01/07 | NPS to do CE by 9/12/05 | NPS to do | NPS to do | Resurfacing of Section 2B from MP 230 to 270 | NC DENR - FHWA to get by 11/18/05 | |||||||||
| Active | NF | SER | Struve | BLRI 2D16 | 01/27/07 | NPS completed CE dated 12/7/05 with the exception of Laurel Fork Bridge Masonry Wingwall & NC Route 16 Stone Arch Bridge. | NPS completed with CE | NPS completed with CE except as noted. | Rehab Parkway Section 2D | Required. | Required. | NC DENR - FHWA to get E&SC plan review. | |||||||
| Active | NF | SER | Struve | BLRI 2E15 | 04/01/08 | NPS to do EA by 4/27/05 | NPS to do | NPS to do | Remove active slide, stabilize, and install subsurface drainage on Pkwy. Reconstruct 200 lf of Pkwy. | Sent on 10/22/03 | |||||||||
| Active | NF | SER | Wong | BLRI 2F22 | 03/21/06 | NPS completed CE 1/15/03 | NPS completed 1/6/03 | Rehab. Goshen Creek Bridge | Sent on 10/22/03 | Required. | Required. | Required. | |||||||
| Done | BAA | SER | Pakhchanian | BLRI 2G12 | 05/20/05 | NPS completed CE 1/13/04 | NPS Completed 1/6/03 | Rehab. Sims Creek Bridge | No work in the stream - no permit required. | less than 1 acre - no permit req. | |||||||||
| Active | NF | SER | Shifflett | BLRI 2G13 | 01/01/06 | NPS to do CE | NPS to do | NPS to do | Repair and resurface Price Park Campground and Picnic Area Loop | NC DENR needed. FHWA to do | |||||||||
| Active | NF | SER | Struve | BLRI 2H13, J16 | 03/15/07 | NPS to do CE | NPS to do | NPS to do | Resurface Parkway from MP 298.6 to 317.5 | NC DENR needed. FHWA to do | |||||||||
| Done | NF | SER | Shifflett | BLRI 2K12 | 01/01/05 | NPS completed CE 10/5/04 | NPS completed with CE | NPS completed with CE | Emergency Slide Repairs to BLRI Pkwy via Design/ Build Contract | ||||||||||
| Done | BAA | SER | Shifflet | BLRI 2M21, N15 | 10/01/04 | NPS completed 8/31/99 | NPS Completed | NPS completed 8/31/99 | Rehab. Paved Waterways | NC DENR Permit Request Mailed 7/21/2004 - Rec. 8/17/04 | |||||||||
| Pending | BAM | SER | Shifflett | BLRI 2N17 | 01/01/11 | NPS to do CE | NPS to do | NPS to do | Resurface Parkway from MP 347.5 to 359.8 - Project is delayed to FY11 by NPS in FY05 | NC DENR needed. FHWA to do | |||||||||
| Active | RD | SER | Struve | BLRI 2P14 | 12/18/05 | NPS completed CE 6/21/04 - Revised 4/27/05 | Endangered plants in Craggy area. Completed with CE | Completed 4/6/04 | Rehab. Roadway Section 2P | Email sent 4/2/04 and 6/7/04 | Required because several navigable streams potentially impacted through culvert work. Nationwide permit and 401 water quality review done concurrently. Angie Pennock (reviewer) called and asked for description of work and photos of all drainage structures. Sent 9/29/05. NW 33 permit #200532784 received 11/28/05. Permit expires March 18, 2007. | Required. E&SC plan review required by NCDENR for issuance of NPDES. Sent to NCDENR 7/18/2005. Letter of Approval received 8/29/2005 approving E&SC plan. Expires 8/29/2008. | Reviewed with Corps permit. NCDENR issued a 401 WQ Certification, received on 11/29/05. | ||||||
| Active | BAM | SER | Jakovich | BLRI 2P15 | 06/01/04 | NPS completed EA by memo dated 7/22/03 | Completed with CE | Completed with CE | Rehab Little Swiss & Craggy Pinnacle Tunnels | <1 acre, no permit req. | |||||||||
| Done | NF | SER | Shifflet | BLRI 2R20-LC | 05/01/04 | NPS completed CE | NPS complete | NPS Completed | Repair of bridge bearings. Provisional ID Number for lead paint removal received 7-26-04. | No permits required. | |||||||||
| Active | NF | SER | Shifflet | BLRI 2T13 | 10/01/06 | NPS to do CE | NPS to do | NPS to do | Buck Spring Tunnel | FHWA to do | FHWA to do | FHWA to get NC DENR if required | Suzette Molling | ||||||
| Active | NF | SER | Shifflet | BLRI 2Y13 | 10/01/06 | NPS to do CE | NPS to do | NPS to do | Big Witch Tunnel | FHWA to get NC DENR if required | FHWA to get all permits | ||||||||
| Active | LT | MWR | Wong | BUFF 10(1) | 05/15/06 | FHWA completed CE 9/22/05 | Sent letter to
FWS on 5/27/2004. Letter Sent to FWS - June 24, 2004 Limited Concurrence Issued 7/9/2004 - Inspection for Endangered Species before construction requested. Sent letter to State on 6/7/2004. State determined no adverse impact 7/8/04 |
NPS completed - 8/24/05 | Rehab. Buffalo Point River Access Road | FHWA to do if required | Waiting on newer plans. .18 to 5+ acres AOD. Need confirmation. Mo Shafii (501) 682-0616 says if under 5 acres AOD no AR permit necessary; just follow SWPP checklist and construction permit nationwide. | ||||||||
| Done | NCR | Shifflet | BW 1E16 | 05/25/99 | NPS to Resolve | Stream Restrict. Mar 1 - June 15 Proj. awarded 6/8/99 | BARC permit received 4/00 | Permit rec. for Stage 1 | Mailed 6/23/99 | MDE Permit received 5/5/99 - Final MDE Permit received 3/00 | Feb 1999 | Mohammad Ebrahimi, Water Res. Reviewer @ MDE 410-631-8094 | |||||||
| Done | NF | NER | Weber | CACO 11(1), 202(1) | 12/15/04 | CE signed by park for 11(1) 12/12/03 & CE for 202(1) Signed by Park on 5/12/04 | FHWA Completed by FWS letter dated 7/15/03. No species present | N/A | FHWA sent letter to NEAC - concurrence receive 8/03 - NPS Fax received on 8/12/03 | Cable Road and Tomahawk Trail | Public Mtg held in FY02 | FHWA to do if required | Note: No permits are required. Simple Mill and overlay, no culverts or streams. Also far enough away from wetlands to avoid county premits. | ||||||
| Active | NF | NER | Madlansacay | CACO 18(1) | 05/01/07 | FHWA to prepare EA, NPS to sign | FHWA sent letter to FWS in June, 2003. FWS letter rec 7/15/03 No species present | NPS to do | Reconstruct Route 18 and SR 6 Intersection & Possibly Herring Cove Parking Area | FHWA to obtain any necessary permits | |||||||||
| Active | NF | NER | Madlansacay | CACO 205(1) | 12/01/05 | FHWA to prepare CE, NPS to sign -- NPS is considering the use of a CE (some emergency pavement removal has already taken place--dune encroachment) - Waiting on NPS to conduct species survey - CE signed 6/8/05 | FHWA sent letter to FWS in June, 2003. FWS letter rec 7/15/03 No Federal species present. NPS to conduct survey for state listed species. Not completed as of 5/4/05 | NPS to do | Rehab Head of the Meadow PA | N/A | N/A | Mailed out permit application set to MADEP, Truro Conservation Commission, Natural Heritage & Endangered Species folks (9/7/06). Mailed out permit fees to allow review to proceed (10/11/03) | FHWA to obtain any necessary permits | ||||||
| Done | DA Updated 8/23/2002 | FWS | Matzke | CAN 10(1) | 12/02/03 | CE by FHWA: 8/13/02 | FWS: ES found to T&E Species, BA complete and cleared 8/6/02 | FHWA to do if applicable | Done 6/03/02 | Rehab Visitor Ctr. Parking Area, New Parking Area & Overlay FR 80 | 2/21/2002 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | Jeff Shryer Refuge Manager (304) 866-3858 |
| Active | KR | FWS | Madlansacay | CCR 10(1) | 10/01/05 | Visitor Center Access Loop and Lower Pool Road | |||||||||||||
| Done | KR | SER | Johnson | CHCH 100(1), 103(1), 105(1) | 12/06/04 | FHWA completed CE signed 8/24/04 | rcv'd FWS ltr 8/29/03 - reply sent 10/17/03 Section 7 complete by letter dated 10/30/03 | 106 Completed (waiting for hardcopy) | Rehab. Alex Viniard, Vittetoe-Chick, & Jay Mill Rds | 6/19/2003 | FHWA to do if applicable | Permit submitted and approved. | |||||||
| Done | KR | SER | Johnson | CHCH 27(7) | 05/24/05 | FHWA to do EIS review and memo to file - Sent to NPS | |||||||||||||