Eastern Federal Lands Highway Division The edge of a forest along the horizon
About EFLHD Projects Procurement Design Resources A highway stretching off into the distance


About EFLHD
Projects
procurement
Design Resources





Related Links
Acronym List
Privacy Policy
Site Map

Steel-backed Timber Guardrail Unit Price Analysis (English)

Item No. Item Description Unit Project Eng.Est Total State Date Quantity Low Bidder Low No. 2 Low No. 3 Low No. 4 Low No. 5
61701G GUARDRAIL SYSTEM SBTA LNFT BW 1A24, B15 15,107,740.00 MD 03/22/95 1,360 54.00 55.00 55.00 50.00 56.00
61701G GUARDRAIL SYSTEM SBTA LNFT PRA/NPS-NATR 3O10,P1 9,874,233.92 MS 04/28/94 560 60.00 61.00 60.00 65.00 60.00
61701G GUARDRAIL SYSTEM SBTA LNFT NPS-GWMP 1A64 (2ND PROP) 8,828,474.80 VA 05/11/94 1,125 48.00 47.00 46.00 50.00 45.00
61701G GUARDRAIL SYSTEM SBTA LNFT BW 1D16,E13,F15 15,900,450.00 MD 06/09/92 1,100.0 42.00 40.00 43.00 45.00 45.00
61701G GUARDRAIL SYSTEM SBTA LNFT SUIT 1BC13 15,300,000.00 MD 09/01/90 7,650.0 40.00 40.00 40.00 40.00 40.00
61701G GUARDRAIL SYSTEM SBTA LNFT PRA-FOOT 15A28,GRSM 3B15 5,581,875.00 TN 09/16/94 220 60.00 50.00 0.00 0.00 0.00
61701G GUARDRAIL SYSTEM SBTA LNFT GWMP 1A61 5088750.00 VA 09/17/92 5,635.0 39.00 41.00 41.00 37.35 30.00
61701G GUARDRAIL SYSTEM SBTA LNFT BLRI 2V13, W7,X8 5,255,560.00 NC 09/26/95 9,700 53.00 68.75 0.00 0.00 0.00
61701G GUARDRAIL SYSTEM SBTA LNFT PNS 1(1) 325,790.00 MD 10/10/93 380 65.00 26.00 60.75 65.00 71.00
61701G GUARDRAIL SYSTEM SBTA LNFT PNS 1(1) 3,909,100.00 MD 10/10/93 360 60.75 65.00 71.00 65.00 26.00
61701G GUARDRAIL SYSTEM SBTA LNFT NPS SUIT 1D15 2,963,349.38 MD 10/10/94 2,100 47.77 0.00 0.00 0.00 0.00
61701G GUARDRAIL SYSTEM SBTA LNFT PNS 1(1), SCH B 276,875.00 MD 10/26/93 380 50.00 55.00 56.00 57.00 69.00
61701H GUARDRAIL SYSTEM SBTB LNFT CUGA 25E24 320,000.00 KY 03/28/91 370.0 43.28 0.00 0.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT PRA-BLRI 2P12 426,624.25 NC 04/13/95 1,725 56.70 50.00 60.00 62.00 80.50
61701H GUARDRAIL SYSTEM SBTB LNFT PRA-COLO 1A15,1B31 2,522,652.26 VA 05/25/93 9,310 42.55 37.50 39.36 41.00 40.00
61701H GUARDRAIL SYSTEM SBTB LNFT NPS-PRWI 10(1) 162,497.00 VA 05/25/94 100 120.00 90.00 150.00 145.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT FOOT 8G12 1,250,000.00 TN 06/13/91 6,570.0 32.00 0.00 0.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT PRA-GWMP 100A26 365,447.00 MD 06/14/94 320 50.00 45.85 45.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT PRA-GWMP 100A26 502,192.50 MD 06/14/94 320 50.00 45.85 45.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT FOOT 8G13,H7 3,770,000.00 TN 06/30/92 9,200.0 36.75 0.00 0.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT BLRI 2L10,P11 625,000.00 NC 07/09/91 350.0 48.00 50.00 40.00 29.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT PRA-VAMA 10(1), ET. AL. 1,260,816.00 NY 08/22/95 740 40.00 50.00 40.00 30.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT DEWA 14(1) 1,000,000.00 PA 08/25/92 460.0 60.00 60.00 65.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT BLRI 2K11 870,000.00 NC 08/27/92 530.0 50.00 60.00 40.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT PRA-CATO 10(3),11(1),ETC 1,819,469.69 MD 08/31/94 1,350 57.57 0.00 0.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT INDU 215(1) 1,825,000.00 IN 09/01/90 1,460.0 26.00 55.00 0.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT BLRI 1S12, T13 2,250,000.00 VA 09/01/90 930.0 39.50 42.00 52.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT PRA-BLRI 1H12,J8,K12 4,088,877.97 VA 09/08/94 21,460 45.00 54.75 0.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT CUGA 25E4 69,000,000.00 KY 09/14/90 11,000 71.00 54.00 54.00 25.00 45.00
61701H GUARDRAIL SYSTEM SBTB LNFT HAFE 14-1(3) 95,000.00 WV 09/14/91 340.0 66.77 0.00 0.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT PRA-FOOT 15A28,GRSM 3B15 5,581,875.00 TN 09/16/94 11,700 44.00 48.00 0.00 0.00 0.00
61701H GUARDRAIL SYSTEM SBTB LNFT VAFO 10(1), 500(1) 77,560.10 PA 09/26/95 1,730 35.50 38.50 44.00 40.00 41.00
61701H GUARDRAIL SYSTEM SBTB LNFT DE-0121 (801) 9,532,732.00 VA 09/26/95 5,825 52.00 50.50 48.00 70.00 40.00
61702F TERMINAL SECTION, TYPE FAT-30 EACH SUIT 1BC13 15,300,000.00 MD 09/01/90 14.0 410.00 400.00 410.00 410.00 670.00
61702F TERMINAL SECTION, TYPE FAT-30 EACH CUGA 25E4 69,000,000.00 KY 09/14/90 8.0 71.00 1,500.00 500.00 500.00 3,500.00
61702F TERMINAL SECTION, TYPE FAT-30 EACH BW 1F16,G14,H14, 14,200,000.00 MD 09/16/92 1.0 35.00 900.00 720.00 1,000.00 750.00
61702F TERMINAL SECTION, TYPE FAT-30 EACH NATR 3X3 5,524,000.00 MS 09/20/91 2.0 575.00 550.00 300.00 0.00 0.00
61702F TERMINAL SECTION, TYPE FAT-30 EACH VAFO 10(1), 500(1) 77,560.10 PA 09/26/95 7 410.00 445.00 300.00 500.00 500.00
61702G TERMINAL SECTION, TYPE FAT-20 EACH PRA-VAMA 10(1), ET. AL. 1,260,816.00 NY 08/22/95 5 600.00 1800.00 625.00 2,000.00 0.00
61702H TERMINAL SECTION, TYPE SBT-BAT EACH SUIT 1BC13 15,300,000.00 MD 09/01/90 4.0 410.00 400.00 410.00 410.00 560.00
61702H TERMINAL SECTION, TYPE SBT-BAT EACH CUGA 25E4 69,000,000.00 KY 09/14/90 2.0 71.00 2,000.00 800.00 500.00 6,000.00
61702H TERMINAL SECTION, TYPE SBT-BAT EACH VAFO 10(1), 500(1) 77,560.10 PA 09/26/95 3 410.00 445.00 300.00 500.00 500.00

   



Home | About EFLHD | Projects | Procurement | Design Resources | Contact Information

USDOT | FHWA | FLHP | EFLHD | CFLHD | WFLHD

Please send your questions or comments to eflhd.webmaster@fhwa.dot.gov