FHWA logo  
A series of project photos depicting the nature of the work of Federal Lands Highway.
     Skip Navigation LinksHome > Traffic Advisory > GWMP Mount Vernon Circle
EFLHD quote: Much like people, every road, every highway, has it's own personality... it's own character. Understanding that character, connecting with it, respecting it, that is the work of the Federal Lands Highway.
spacer     Navigation
Skip Navigation Links.

Eastern Federal Lands Highway Division
703-404-6260
1-800-892-8776
Prompt #3: Construction Information

Email:
efl.fhwa@fhwa.dot.gov
Subject reference: Construction Information
 

     George Washington Memorial Parkway (Mount Vernon Circle and Parking Lots) GWMP 1A103

Work for the Week of May 11 to May 17, 2008

New Parking Lot

  • Continuing excavation and hauling of existing material off site
  • Commencing excavation and formwork for the upper retaining wall footings
  • Continuing installation of storm water pipe and manholes
  • Placing reinforcing and backfill material for the lower retaining wall

Note:  A temporary pedestrian detour trail is open to pedestrians for access around the new parking lot during construction.

West Parking Lot North Side:

  • The first row of parking spaces is closed to facilitate construction of the new lot.
  • Construction on this parking lot is anticipated starting June 2008

West Parking Lot South Side:

  • Work is anticipated starting June 2008

Route 235 Intersection:

  • Work is anticipated starting July 2008

Mount Vernon Circle

  • Work is anticipated starting August 2008

East Parking Lot North Side:

  • Work is anticipated starting August 2008

East Parking Lot South Side:

  • Work is anticipated starting September 2008

Multi-use Trail:

  • Work is anticipated starting August 2008
Traffic Control/Weekend and Night Work for Upcoming Week:
  • None anticipated
General Traffic Details / Affects to Public:

The George Washington Memorial Parkway and Mount Vernon Circle will remain open at all times. No construction activities will occur during rush hours from 5:00 am to 9:30am and from 3:00 pm to 7:00 pm, Monday through Friday. The Fairfax County trail through the picnic area at the west lot will be closed during construction, but pedestrian access will be maintained for all other trails. Portions of the parking areas will be closed for construction.

General Project Description

The National Park Service, in cooperation with the Federal Highway Administration - Eastern Federal Lands Highway Division, has started construction on a variety of pedestrian and vehicular traffic improvements in the vicinity of Mount Vernon. The project consists of constructing a new overflow parking area at the west parking lot of Mount Vernon; reconfiguring the Mount Vernon Circle to improve traffic flow; extending the Mount Vernon Trail to connect with the Potomac Heritage National Scenic Trail; and milling and overlaying the existing parking lots at Mount Vernon.

Construction began in March 2008, and is expected to be complete by October 2008.